Logo

Waterline Home | State Site Code Index | 800 Report Numbers | FlowCast Sites

BACKLINK: BACKLINK-PLACEHOLDER


SITE-CODE: 365123


SITE-TITLE-WEB: Salmon River at Lighthouse Hill


PUBLISH-TITLE: Altmar, NY


STANDARD-LEADING: For the Salmon River at Brookfield Renewable Power's Lighthouse Hill Dam, Altmar, NY. The following predictions are for flows in the river just below the powerhouse unless otherwise noted.

Information about the timing of water level changes downstream of the powerhouse is included after the forecast.
STANDARD-TRAILING: Any changes to this schedule are normally made by 3:30 PM Daily. One or more flow increases may occur during this forecast period. Here is about how long it will take after a flow increase at the power plant for fast rising waters and swift currents to reach the following places downstream.. ALTMAR - 30 minutes; PINEVILLE - 1 hour and 40 minutes; RT 81 - 2 hours and 50 minutes; Blackhole - 3 hours and 30 minutes.
FLOW-CURRENT:

CONTENT-1: STANDARD-SAFETY:

CONTENT-2: SPECIAL-LEADING:

CONTENT-3: SPECIAL-SAFETY:

CONTENT-4: SPECIAL-TRAILING:

CONTENT-5: FLOW-FORECAST:

CONTENT-6: FLOW-SPECIAL:

CONTENT-7: SPILL-COMBINATION:



Terms of Use



Site reports are also available toll-free by phone: Boaters call 1-800-452-1737 - Anglers call 1-800-452-1742 to access Waterline's Toll-Free Hotline. At the voice prompt, enter the six-digit code for the site you want.

BACKLINK: BACKLINK-PLACEHOLDER


Waterline Home | State Site Code Index | 800 Report Numbers | FlowCast Sites


Waterline is an electronic publication of Virtual Publishing LLC
Copyright 1992 - 2018 Virtual Publishing LLC All Rights Reserved
http://h2oline.com